Publications

510 documents

  • Vahid Hajipour, Amirsaman Kheirkhah, Madjid Tavana, Nabil Absi. Novel Pareto-based meta-heuristics for solving multi-objective multi-item capacitated lot-sizing problems. International Journal of Advanced Manufacturing Technology, 2015, 80 (1), pp.31-45. ⟨10.1007/s00170-015-6993-6⟩. ⟨emse-01181848⟩
  • Barnaby Norris, Guillaume Schworer, Peter Tuthill, Nemanja Jovanovic, Olivier Guyon, et al.. The VAMPIRES instrument: imaging the innermost regions of protoplanetary discs with polarimetric interferometry. Monthly Notices of the Royal Astronomical Society, 2015, 447 (3), pp.2894-2906. ⟨10.1093/mnras/stu2529⟩. ⟨hal-02509131⟩
  • Sophie Demassey, Dominique Feillet. Hybridation de programmation linéaire et de programmation par contraintes pour le problème de déplacement de conteneurs. ROADEF'15 - 16ème congrès annuel de la Société française de Recherche Opérationnelle et d'Aide à la Décision, Feb 2015, Marseille, France. ⟨hal-01109049⟩
  • Sebastian Knopp, Stéphane Dauzère-Pérès, Claude Yugma. Flexible Job-Shop Scheduling with Batching for Semiconductor Manufacturing. 6ème conférence Société Française de Recherche Opérationnelle et Aide à la Décision, Feb 2015, Marseille, France. ⟨hal-01163555⟩
  • Ahmed Senoussi, Nadia Kinza Mouss, Bernard Penz, Nadjib Brahimi, Stéphane Dauzere-Peres. Heuristics Based Genetic Algorithm for Capacitated Multi-Vehicle Production-Inventory-Distribution Problem. Roadef 2015, Feb 2015, Marseille, France. ⟨hal-01178682⟩
  • Nabil Absi, Claudia Archetti, Stéphane Dauzère-Pérès, Dominique Feillet. A two-phase iterative heuristic approach for the production routing problem. Transportation Science, 2015, 49 (4), pp.784-795. ⟨emse-01092245⟩
  • Elisabeth Zehendner, Marco Caserta, Dominique Feillet, Silvia Schwarze, Stefan Voss. An Improved Mathematical Formulation for the Blocks Relocation Problem. European Journal of Operations Research, 2015, 245, pp.415-422. ⟨emse-01135457⟩
  • Cathy Wolosewicz, Stéphane Dauzere-Peres, Riad Aggoune. A Lagrangian Heuristic for an Integrated Lot-Sizing and Fixed Scheduling Problem. European Journal of Operational Research, 2015, 244 (1), pp.3-12. ⟨10.1016/j.ejor.2015.01.034⟩. ⟨emse-01278271⟩
  • Mehdi Rowshannahad, Stéphane Dauzere-Peres, Bernard Cassini. Capacitated qualification management in semiconductor manufacturing. Omega, 2015, 54, pp.50-59. ⟨10.1016/j.omega.2015.01.012⟩. ⟨emse-01278273⟩
  • Rafik Makhloufi, Diego Cattaruzza, Frédéric Meunier, Nabil Absi, Dominique Feillet. Simulation of Mutualized Urban Logistics Systems with Real-time Management. Transportation Research Procedia, 6, pp.365-376, 2015, 4th International Symposium of Transport Simulation (ISTS'14) Selected Proceedings. ⟨emse-01147475⟩