510 documents
- Sylvain Housseman, Nabil Absi, Dominique Feillet, Stéphane Dauzère-Pérès, Lise-Marie Daufresne, et al.. Utilisation des NTIC dans la gestion d'un stock d'échantillons biologiques: la simulation pour aider à la décision. GISEH'08 (Gestion et Ingénierie des SystEmes Hospitaliers), Sep 2008, Lausanne, Suisse. pp. 167-174. ⟨emse-00562612⟩
- Imen Essafi, Yazid Mati, Stéphane Dauzère-Pérès. A genetic local search algorithm for minimizing total weighted tardiness in the job-shop scheduling problem. Computers and Operations Research, 2008, 35 (8), pp.2599-2616. ⟨10.1016/j.cor.2006.12.019⟩. ⟨emse-00520349⟩
- Ariane Ferreira, Agnès Roussy, Lamine Condé. Virtual Metrology models for predicting physical measurement in semiconductor manufacturing. ASMC '09. IEEE/SEMI, May 2008, Berlin, Germany. pp.149-154, ⟨10.1109/ASMC.2009.5155973⟩. ⟨emse-00450842⟩
- Claude Yugma, Stéphane Dauzère-Pérès, Alexandre Derreumaux, Olivier Sibille. A Batch Optimization Sofware for diffusion area scheduling in semiconductor manufacturing. 2008 IEEE/SEMI Advanced Semiconductor Manufacturing Conference (ASMC), May 2008, Cambridge, France. ⟨10.1109/ASMC.2008.4529063⟩. ⟨emse-01792345⟩
- Cathy Wolosewicz. Approche intégrée en planification et ordonnancement de la production. Sciences de l'ingénieur [physics]. Ecole Nationale Supérieure des Mines de Saint-Etienne, 2008. Français. ⟨NNT : ⟩. ⟨tel-00470748⟩
- Nabil Absi, Safia Kedad-Sidhoum. The multi-item capacitated lot-sizing problem with setup times and shortage costs. European Journal of Operational Research, 2008, 185 (3), pp.1351-1374. ⟨10.1016/j.ejor.2006.01.053⟩. ⟨hal-00506261⟩
- Benoît de Dinechin, Christian Artigues, Sadia Azem. Resource-constrained Modulo scheduling. Christian Artigues, Sophie Demassey and Emmanuel Néron. Resource Constrained Project Scheduling. Models, Algorithms, Extensions and Applications., ISTE-WILEY, pp.267-277, 2008, Control Systems, Robotics and Manufacturing Series. ⟨hal-00271651⟩
- Nabil Absi. Models and methods for capacitated lot-sizing problems. 4OR: A Quarterly Journal of Operations Research, 2008, 6 (3), pp.311-314. ⟨10.1007/s10288-007-0062-4⟩. ⟨emse-01182235⟩
- M. Bureau, Stéphane Dauzère-Pérès, Claude Yugma, Leon Vermarien, J.-B. Maria. Simulation results and formalism for global-local scheduling in semiconductor manufacturing facilities. 2007 Winter Simulation Conference, Dec 2007, Washington, France. ⟨10.1109/WSC.2007.4419801⟩. ⟨emse-01792355⟩
- S. Azem, R. Aggoune, Stéphane Dauzère-Pérès. Disjunctive and time-indexed formulations for non-preemptive job shop scheduling with resource availability constraints. 2007 IEEE International Conference on Industrial Engineering and Engineering Management, Dec 2007, Singapore, France. ⟨10.1109/IEEM.2007.4419298⟩. ⟨emse-01792359⟩
